Grand Floridian refurbishments

Share This!

The pool is scheduled for a rehab 1/5-1/23 – guests will be able to use the Polynesian pool along with Contemporary guests (who also wont have a pool). Additionally, the main building at the Grand will be getting it’s rehab this spring/summer. The tile is scheduled to be replaced in work running through early July.

Leave a Reply

Your email address will not be published. Required fields are marked *